Process
From first conversation to install — under six weeks.
-
Stage 1
Week 1
In-showroom consultation
90 minutes in our DC showroom. Walk material samples, talk through your project, no charge.
-
Stage 2
Week 1–2
Field measure & elevations
We measure the room and deliver elevation drawings within seven business days.
-
Stage 3
Week 2
Final specification
Finishes confirmed in showroom. Written specification delivered. Project priced.
-
Stage 4
Week 2–3
Shop drawings
Detailed shop drawings reviewed with you (and your designer or architect) before fabrication starts.
-
Stage 5
Week 3–5
Fabrication
European doors and finishes ordered against your specification. Local carcass build. Quality check before delivery.
-
Stage 6
Week 6
Install
Five to eight working days. Same in-house crew. Floor and wall protection. Single point of contact.